Best engineers team for Solar Panel Maintenance & Service in Rajasthan
Scope of Solar Panel Services and Procedure
The scope of O & M is for trouble free operation of the power plant to ensure that maximum solar energy is fed to the grid. Following activities are envisaged as part of O & M:
- Trouble free operation of the Power Plant.
- Ensure that the Power Generated is pumped to Grid without any problem.
- Monitor the Performance of the Power Plant by data logging.
- Monthly report preparation & reporting to Customer on performance of Power Plant.
- Maintenance of Module – Periodic cleaning of 1 MW Solar PV Modules
- Scheduled maintenance of Inverter, LT, and HT & Transformer.
- Attend the emergency break down of the components.
- Frequent testing of plant equipment by ‘Walk Down’ checks the internal condition of equipment such as module performance, inverter efficiency test, monitoring system testing etc.
- Careful logging of operation data and periodically processing it to determine abnormal or slowly deteriorating conditions.
- Careful control and supervision of operating conditions. (Wide and rapid variations in voltage and frequency conditions do contribute to increased maintenance).
- Regulate routine maintenance work such as housekeeping of plant area, keeping equipment clean, cleaning of modules, proper maintenance of inverters etc.
- Spare parts and inventory maintenance.
- Proper codification of all spares and consumables.
- Spare parts indenting.
- Indenting and maintaining minimum level of critical mandatory and recommended spares.
Are you looking for a Solar Panel Engineers in Jaipur & All over Rajasthan? Process Now! Call @ 911-911-2929 / 91160-98980 .Save your time by registering on our website.
Plant Maintenance Schedule
Sl. No. |
Inspection |
Actions required |
Inspection Frequency |
A |
Solar Modules |
||
1. |
Dust deposition |
Cleaning of modules |
About 15 Days Average |
2. |
Module Junction box malfunction, visual inspection |
Replace the Module in case of failure. |
1 Month |
3. |
Improper Module Cable Connectors |
Replace the Cables / Connectors |
1 Month |
4. |
De-lamination, discoloration leading to low output |
Replace the Module |
1 Month |
5. |
Module Cracks |
Replace the module |
1 Month |
B |
Solar Module Mounting Structure |
||
1. |
Inspection of Mounting Structure and Hardware |
Check Fasteners – take remedial measures in case of issues. Check lugs of earthing conductors for corrosion – change as needed. |
3 Month |
C |
Inverter (Input) Technical Parameters |
||
1. |
DC Voltage @ Connection Point |
3 Months |
|
2. |
Current @ Connection Point |
3 Months |
|
D |
Inverter |
||
1. |
Loose cable Termination |
Tighten the connection |
6 Months |
2. |
Dust Deposition |
Cleaning |
Monthly |
3. |
Cleaning of Air Filters |
Cleaning |
Monthly |
4. |
Performance monitoring |
Visual |
Daily |
5. |
Data Logging |
|
Daily |
6. |
Report preparation |
|
Monthly |
E |
Inverter (Output) Technical Parameters |
||
1. |
Output Voltage |
3 Months |
|
2. |
Current |
3 Months |
|
3. |
Frequency |
3 Months |
|
4. |
Output Power |
3 Months |
|
F |
LT Panel |
||
1. |
Loose cable Termination |
Tighten the connection |
6 Months |
2. |
Schedule maintenance as indicated by LV Panel Supplier |
|
|
3. |
Dust Deposition |
Cleaning |
Monthly |
4. |
Performance monitoring |
|
Daily |
G |
LT Panel (Output) Technical Parameters |
||
1. |
Voltage |
|
Monthly |
2. |
Current |
|
Monthly |
3. |
Frequency |
|
Monthly |
H |
Transformer |
||
1. |
Schedule maintenance as indicated by Transformer Supplier |
|
|
2. |
Dust Deposition |
Cleaning |
2 Months |
3. |
Performance monitoring |
|
Daily |
I |
Transformer (Output) Technical Parameters |
||
1. |
Voltage |
|
Monthly |
2. |
Current |
|
Monthly |
3. |
Frequency |
|
Monthly |
J |
MV Panel |
Schedule maintenance as indicated by MV Panel Supplier |
|
1. |
Dust Deposition |
Cleaning |
3 Months |
2. |
Performance monitoring |
|
Daily |
K |
MV Panel (Output) Technical Parameters |
||
1. |
Voltage |
|
2 Months |
2. |
Frequency |
|
2 Months |
L |
Emergency Break down |
|
As and When |
M |
Spare parts |
Ensure availability of spare parts as required for the plant to run normally. |
1 Month |
N |
Irradiance Meter cleaning |
Cleaning with soft cloth |
Daily |
O |
Cable (AC & DC) |
Visual inspection |
15 Days |
P |
SCADA |
Data Monitoring |
Daily |
All periodic maintenance & inspections shall be done as specified by the equipment manufacturers.
Shipping Cost |
|
Shipping | Ready to ship in 3 Business Day |